Working with the mechanical HVAC specialists, we supplied electrical refurbishment works to the boiler rooms with additional new works throughout various hospital wings, including:

  • Three-phase power distribution and final local circuits utilising steel conduit and low smoke, zero halogen cabling.
  • New time controlled distribution circuits for existing electric water heating systems.
  • Electrical enabling and temporary works in conjunction with mechanical strip out of the central boiler plant and heat exchangers.
  • Three phase sub-main power to new boiler control plant.
  • Install new power, lighting & emergency lighting to plant rooms, utilizing various containment systems that included steel conduit & trunking, SWA & cable tray.
  • Carry out works with safety lockout isolation and testing procedures on the main 1600 amp feeder panel, fed from a dedicated supply with an approximate capacity of 1.4MVA
  • Test & commission completed installations.