Carry out refurbishment works to the main boiler room. This included an electrical shutdown of the entire hospital to carry out essential work at the main incoming 200KVA supply during a time critical window of one hour.
We successfully completed the operation in just thirty-four minutes thanks to our advance planning and preparation.

Other works included:

  • New three phase sub-mains for heating plant control pane
  • Electrical enabling and temporary works in conjunction with mechanical strip out of the existing boiler plant and heat exchangers.
  • Install new power, lighting and emergency lighting utilising various containment systems including steel conduit, trunking and SWA.
  • Test & commission completed installations.